  • Unique Park and Building features that support for Economical Multi and Interdisciplinary Research projects housing a variety of research programs that have diverse needs. In addition, it allows for collaboration without contamination and changing group sizes due to its separate wings connected for material and personnel movement and separated by courtyard for the natural lighting and ventilation. The facility allows for a variety of supply and exhaust provisions for economical tenant improvements.

    gearicon
  • Flexibility in Managing Laboratory Space Allocations in different wings considering the research program growth, interaction opportunities and provides flexibility in sharing support spaces between the wings.

    gearicon

R&D and Pilot Scale

operationscenterimae
  • gearicon

    Linear with Contiguous Support coupled with high efficiency floor plates maximizes capacity for large research programs and supported by distributed offices on the front side.

  • gearicon

    The park and building support pilot plants to manufacture wide array of batch sizes meant for different purposes such as: product development, analytical development & scaleup batches. The separate wing shall be planned for the Pilot scale batches with proper process flow, co-ordinated with building systems & utilities, safety & environmental considerations and GMP guidelines.

Manufacturing

This park shall provide plug n play land with necessary infrastructure to the potential investors willing to set up green field projects using the fully developed park infrastructure roads, ETP/STP, effluent lines, Power substation and distribution, Data and telecom facilities. These facilities shall have support facilities for manufacturing in Building 7000 for Material Testing Lab, Skill Development Centres, Quality Certification Lab /R&D Centre

Data Center

Keystone is a 19 acre campus technology park with 250,000 SF that qualify as per TIA-942 to suit Tier 3/ 4 Data center. Master planned by Singapore based architects- Subana Jurong providing clean environment with courtyards, landscaped gardens and scenic water body

A new infrastructure strategically located taking into account the most critical factors needed for successful operation of a data centersuch as existing multiple power source availability owing to redundant connections to the adjacent power station, provision of multiple network connectivity and scalability to expand operations with in the campus vacant land parcel